Projects

Energy Australia East Lindfield
132kV Cable installation

Geotherm were responsible for the collection and testing of the flowable backfill material used during the cable installation of the East Lindfield project. The cable installation was 10km in length from East Lindfield Substation to Willoughby Substation, with the backfill required to be tested every 100meters of trench.